Clients: Xisorak Gidro Qurilish - Tashkent, Uzbekistan
Scope: Construction of RIDNDS/ICB/DZ-2 “Construction of
the M2 supply channel”
Clients: Bulungur Co.
Scope: Reconstruction of 1017-1025 km of road M-39 "Alma
Ata-Bishkek-Tashkent-Shakhrisabz-Termiz"
Clients: ODSP-15 Co.
Scope: Reconstruction of the channel in the Sardoba
district of Gulistan area - Uzbekistan
Clients: Kuprik Yul Kurilish Co.
Scope: Construction of a new bypass road of Karshi city -
Uzbekistan
Clients: World Bank (WB)
Scope: Supply and Rehabilitation of Samarkand Main Waste
Water Treatment Plan - Uzbekistan
Clients: World Bank (WB)
Scope: ICB/AK/W/08R "Design Area 8: Karakul District
Southwest. Construction of Primary and Secondary Trunk Mains,
Regional Water Distribution Center «Karakul West», Rural Water
Distribution Centers and Distribution Systems" - Uzbekistan
Clients: World Bank (WB)
Scope: ICB/AK/W/07 "Project zone №7. The Eastern part of
Karakul district. The construction of the elements of water
distribution, supply water-carriers, rural distributing networks
and customer connections" - Uzbekistan
Clients: World Bank (WB)
Scope: BVK/ICB/W/05 "Reconstruction of pressure sewerage
networks (11,35 km) from pumping station «Beklar» in Kagan to
«Southern» collector in Bukhara city"- Uzbekistan
Clients: World Bank (WB)
Scope: Additional scope of work within the contract
BVK/ICB/W/05 - Uzbekistan
Clients: Islamic Development Bank (IsDB)
Scope: SSIP/ICB/MC/W-1.2.4 «Construction and
reconstruction of sewage disposal networks in Gulistan city» -
Uzbekistan
Clients: Asian Development Bank (ADB)
Scope: TP-CW-02 «Сonstruction and rehabilitation of
transmission mains from VU-1 to VU-3» - Tashkent, Uzbekistan
Clients: Islamic Development Bank (IsDB)
Scope: RIDNDS/ICB/DZ-1 “Construction of pump station
number 3 and ancillary work” - Uzbekistan
Clients: World Bank (WB)
Scope: SOVK/W/04 "Replacement and construction of sewers
in Samarkand” (Package I – 20.2 km)" work” - Uzbekistan
Clients: WKhokimiyat - UZGOV
Scope: BVK/W/03-SUB "Reconstruction of sewerage networks
with length 16.8 km in Bukhara city" - Uzbekistan
Clients: Khokimiyat - UZGOV
Scope: "Reconstruction of water intake facilities"
Charkhin "in Samarkand" - Uzbekistan
Clients: World Bank (WB)
Scope: SOVK/ICB/W/5-2R "Construction of sewers in
Samarkand (9.9 km)" - Uzbekistan
Clients: Khokimiyat - UZGOV
Scope: Construction of a sewage pumping station and
sewerage network in the tourist area of Samarkand City -
Uzbekistan
Clients: World Bank (WB)
Scope: SOVK/ICB/W/5-2R "Construction of sewers in
Samarkand (9.9 km)" - Uzbekistan
Clients: Toshkent Suv Ta’minoti” LLC - ADB
Scope: Design and Build of Pump Station, Water
Distribution Center: Supply Water Conduit and Water
Networks, Tashkent - Uzbekistan
Clients: Sirdarya Suv Ta’minoti” LLC - IsDB
Scope: Design and Build of Sewage collection network and
pump station in Sirdarya - Uzbekistan
Clients: Ministry of Municipality and Tourism -
KRG/IRAQ
Scope: Design and Build of Water intake, Booster pump
station, 140 Km ductile pipeline, 14 water reservoir tanks, 45
km OHL 33 kv in KRG/IRAQ
Clients: MMPW/IRAQ
Scope: Design and Build of Sewage treatment plant, sewage
collection network, pump station/IRAQ
Clients: Maxus Qurlish Co.
Scope: DBO of Hotel SAGBAN in Tashkent City with 130
Rooms (4star) in Tashkent City- Uzbekistan
Clients: Ministry of Agricalture & Water Resources -
KRG/IRAQ
Scope: Design of Feasibility Study and Design of Rawanduz
RCC Dam- Iraq
Clients: Ministry of Agriculture & Water Resources -
KRG/IRAQ
Scope: Design, Procurement and construction of Bassara
RCC Dam (Length of the RCC dam: 198 m, Length of the fill dam:
87 m, Suleymaniyeh- Iraq
Clients: Maxsus qurilish LLC
Scope: Design, build and operation of HDPE Pipe factory
with 3 production line from 70mm up to 1600mm